What's the Requiredment for Steel Balls of Ball Mill?

2013-09-30 14:57:18


During the operation of the ball mill, feed 80% of the steel balls into the ball mill. After continuous running for two or three days, check if the condition of the engagement of the gear is correct and if it is correct, then feed the remaining 20% of the steel balls.


Due to the abrasion, you should fill in new balls to meet with the requirement for ball capacity.


After operation for a certain period of about 3000 hours, you should shut down the ball mill, and remove the broken balls and balls with diameter smaller than 15mm, and then fill in the new steel balls.


The size range of the steel balls used for ball mill should be 25-60mm.


Zhengzhou UNIQUE Company is a professional and reliable ball mill manufacturer. More information about our machine, please feel free to contact with us by phone or e-mail at any time!