Inspection and Preparation before Running a Jaw Crusher

2014-01-03 10:18:46


1. Before starting the jaw crusher, must firstly check the lubrication if it is normal, making sure there is no blockage, leakage and other phenomena.

2. Check the entire instrument to see if it is intact.

3. Adjusted the discharge opening to the appropriate scale.

4. Check whether there is ore or other objects in crushing cavity before starting.

5. Adjust the V-belt tension spring and locking modulation moderately.

6. Check the electrical interlock, lighting as well as the number of connected protection facilities is complete properly.

7. Check the connection bolts to see if there is any loose phenomenon.

Zhengzhou UNIQUE Company is a professional and reliable crusher manufacturer. More information about our machine, please feel free to contact with us by phone or e-mail at any time!